Our Catalyst superyacht tender has made massive strides following the Christmas break.
With the majority of the internal structure, systems and components installed within the hull, the cockpit soles were glued down, work began on the ‘floating floor’ cabin interior structure, which is nearing completion.
Our client has requested a number of significant upgrades during B74's build, making her arguably the most luxurious and well-equipped Catalyst constructed to date.
For a more in-depth look at B74's progress follow this link over to our blog pages.
B74: Catalyst Superyacht Tender – Interior Structure Installed
Cockpit sole dry fitting. You can also see both fuel tanks are installed & the forward cabin/storage areas are underway. Yes, this boat has a two-berth cabin.
1/3
Foredeck being test fitted and marked up for trimming to size - before final glue down.
2/3
This confusing picture is actually the floating cabin interior structure under construction. Once installed, it will make a lot more sense, which will be in the next update..
3/3