We are very excited to announce the start of a new project for a one of our clients…. an Elite 16m Mid Pilothouse. This is the second boat we are building for this client.

Sven installing plywood hull sheathing
1/18

Hull fairing has commenced
2/18

Third & final layer
3/18

Exterior lamination. First of three layers of fiberglass.
4/18

Both sides done
5/18

Starboard completed
6/18

Pre-epoxying the Balsa core sheets
7/18

Fiberglass inside laminate laid over the plywood. The pre-epoxied, end grain Balsa core is then placed on top - of the still wet - Fiberglass bond layer
8/18

Keel being laminated. Note - First board on the right is the Hardwood Keel batten
9/18

Bill (Designer) and Gareth (Team Leader) finalising some points before build commences
10/18

Girders installed & shaping the chines
11/18

Stem installed. Sven & Aaron fitting chines to stem
12/18

All stood-up
13/18

Grid marked out and first frames stood-up
14/18

Fiberglassing one of the outside girders
15/18

Stem being laminated
16/18

Frames being assembled
17/18

Serim removing the CNC cut hull framing from the nested panels
18/18